Skip to main content
Connect SAP S/4HANA and Satyakod reads, every hour:
  • Products from the material master (API_PRODUCT_SRV): the SAP product number becomes the SKU, the English description the name, and the EAN/UPC the GTIN. Only the product types you choose are read (finished goods FERT and trading goods HAWA by default); products marked for deletion are skipped.
  • Production orders (API_PRODUCTION_ORDER_2_SRV) planned from today on, if you choose: each becomes a draft batch once, with the order number as its lot and the planned start as its production date. Your team reviews and signs it in Batches.

Connect

Admins open Settings → Integrations → SAP S/4HANA → Connect and enter: Satyakod tests the connection when you save and runs a first sync. Sync now runs another; Disconnect stops syncing (products and batches already made stay).

Sync results

The card shows the last sync: products added and updated, production orders imported, and orders skipped (their material isn’t a product here, the quantity is missing or out of range, or a pilot has reached its code limit). If SAP refuses the user or password, the card says so.